• Triumph@fedia.io
    link
    fedilink
    arrow-up
    7
    ·
    5 days ago

    When you’re the FAA, you still don’t decommission the old system until the new one has been in production for a long time. They left themselves without a fallback position.

    • shalafi@lemmy.world
      link
      fedilink
      English
      arrow-up
      3
      arrow-down
      1
      ·
      4 days ago

      And now I have heard more, and nothing like what you describe happened (or was even planned):

      "A contractor had been working on replacing a section of the system’s old and discontinued copper wire with new fiber wire in a remote location on Friday afternoon, Secretary of Transportation Sean Duffy said Saturday. That kind of work has been happening across the country and across industries for decades, he said.

      But on Friday, the router in that location started overloading the air traffic control system and causing intermittent disruptions to communications and radar feeds. When they couldn’t quickly locate the cause of the overload, they decided to keep flights grounded nationwide."

      https://apnews.com/article/us-flights-grounded-back-to-normal-7dce2343ceb56332aa7946a27fcae562